Jump to content

Yellow Line (Delhi Metro)

From Wikipedia, the free encyclopedia

Yellow Line
(Line 2)
A Bombardier eight-coach train leaves from Patel Chowk metro station
Overview
LocaleDelhi, Gurgaon
Termini
Stations37
Service
TypeRapid transit
SystemDelhi Metro
OperatorDelhi Metro Rail Corporation
Rolling stockMitsubishi-Hyundai Rotem
Bombardier MOVIA
Daily ridership1,552,152 (May 2026)[1]
History
Opened20 December 2004; 21 years ago (20 December 2004)
Last extension10 November 2015
Technical
Line length49.02 km (30.46 mi)
CharacterUnderground and Elevated
Track gauge1,676 mm (5 ft 6 in) broad gauge
Electrification25 kV 50 Hz AC from overhead catenary
Route map

Siraspur Depot
Samaypur Badli
Rohini Sector 18, 19
Outer Ring Road
Haiderpur Badli Mor
Jahangirpuri
Adarsh Nagar
Ring Road
Azadpur
Model Town
Guru Tegh Bahadur Nagar
Vishwavidyalaya
Timarpur - Kyber Pass Depot
Vidhan Sabha
Civil Lines
ISBT Road
Kashmere Gate
Maharana Pratap Inter State Bus Terminus
Mainline rail interchange Old Delhi Railway Station
Chandni Chowk
Old Delhi Railway Station
Chawri Bazar
Mainline rail interchange New Delhi railway station
New Delhi New Delhi railway station
service tunnel to Blue line
Rajiv Chowk
Patel Chowk
Central Secretariat
Seva Teerth
Lok Kalyan Marg
Jor Bagh
Dilli Haat - INA
Ring Road
AIIMS
Green Park
Hauz Khas
Outer Ring Road
Malviya Nagar
Saket
Mehrauli Badarpur Road
Qutab Minar
Chhatarpur
Sultanpur
Sultanpur Depot
Ghitorni
Arjan Garh
Delhi
Haryana
border
Guru Dronacharya
Sikanderpur
MG Road
IFFCO Chowk
Millennium City Centre Gurugram

The Yellow Line (Line 2) is a rapid transit metro line of the Delhi Metro in Delhi, India. It consists of 37 stations from Samaypur Badli in Delhi to Millennium City Centre Gurugram in the neighbouring city of Gurgaon in Haryana. The 49.02 kilometers (30.46 mi) line is mostly underground and laid under one of the most congested parts of Delhi.[2] The Yellow Line is the second line of Delhi Metro to become operational after the Red Line.

It is the 3rd longest metro line on the Delhi Metro network. This line covers North Delhi, through Central Delhi, New Delhi, South Delhi and finally the city of Gurgaon in Haryana. The Yellow line has interchanges with the Red, Blue, Violet, Pink and Magenta lines of the Delhi Metro, as well as with the Old Delhi and New Delhi railway stations of the Indian Railways. The Line also connects with the Airport Express Line at New Delhi metro station. Chawri Bazar metro station is the second deepest station of the Delhi Metro network and is situated about 25 metres (82 ft) below ground level and has 18 escalators.

History

[edit]

The Vishwavidyalaya to Kashmere Gate section was the first underground section of Delhi Metro to be completed and became operational for public. Prime Minister Manmohan Singh inaugurated this 4 km (2.49 mi) stretch on 19 December 2004.[3]

The following dates represent the dates the section opened to the public, not the private inauguration.

Yellow Line
Phase Extension date Termini Length Stations
I 20 December 2004VishwavidyalayaKashmere Gate4.06 kilometers (2.52 mi)4
3 July 2005Kashmere GateCentral Secretariat6.62 kilometers (4.11 mi)6
II 4 February 2009VishwavidyalayaJahangirpuri6.38 kilometers (3.96 mi)5
21 June 2010Millennium City Centre GurugramQutab Minar15.82 kilometers (9.83 mi)9
26 August 2010Chhatarpur[4]–1
3 September 2010Central SecretariatQutab Minar[5]11.76 kilometers (7.31 mi)9
III 10 November 2015JahangirpuriSamaypur Badli[6]4.38 kilometers (2.72 mi)3
TotalSamaypur BadliMillennium City Centre Gurugram49.02 kilometers (30.46 mi)37

Stations

[edit]
Yellow Line
# Station Name Phase Opening Interchange Connection Station Layout Platform Level Type
English Hindi
1Samaypur Badliसमयपुर बादली III 10 November 2015up Badli and Red Line Narela SECTOR A-7 (DDA Sports Complex) Elevated Side
2Rohini Sector 18, 19रोहिणी सेक्टर 18, 19 None
3 Haiderpur Badli Mor हैदरपुर बादली मोड़ Magenta Line Island
4Jahangirpuriजहांगीरपुरी II 4 February 2009 None Side
5Adarsh Nagarआदर्श नगरup Adarsh Nagar
6 Azadpur आज़ादपुर Pink Line
Magenta Line
(Phase IV – Under Construction)
7Model Townमॉडल टाउन None
8Guru Tegh Bahadur Nagarगुरु तेग बहादुर नगर Underground
9Vishwavidyalayaविश्वविद्यालय I 20 December 2004
10Vidhan Sabhaविधान सभा
11Civil Linesसिविल लाइन्स
12 Kashmere Gate कश्मीरी गेट Red Line
Violet Line
Bus interchange Kashmere Gate ISBT
Island
13Chandni Chowkचाँदनी चौक3 July 2005 Delhi Junction
14Chawri Bazarचावड़ी बाज़ारNone
15 New Delhi नई दिल्ली Airport Express
Magenta Line
(Phase V(A) – Approved)
New Delhi
16 Rajiv Chowk राजीव चौक Blue Line
17Patel Chowkपटेल चौकNone
18 Central Secretariat केन्द्रीय सचिवालय Violet Line
Magenta Line
(Phase V(A) – Approved)
Side
19Seva Teerth[7] सेवा तीर्थ II 3 September 2010None Island
20Lok Kalyan Margलोक कल्याण मार्ग
21Jor Baghजोर बाग़
22 Dilli Haat – INA दिल्ली हाट - आईएनए Pink Line
23AIIMSएम्सNone
24Green Parkग्रीन पार्क
25 Hauz Khas हौज़ ख़ास Magenta Line
26Malviya Nagarमालवीय नगरNone
27Saketसाकेत
28Qutab Minarक़ुतुब मीनार21 June 2010 Elevated Side
29Chhatarpurछत्तरपुर26 August 2010 Golden Line
(Phase IV – Under Construction)
30Sultanpurसुल्तानपुर21 June 2010 None
31Ghitorniघिटोरनी
32Arjan Garhअरजन गढ़
33Guru Dronacharyaगुरु द्रोणाचार्य
34 Sikanderpur सिकन्दरपुर Rapid Metro
35MG Roadएम जी रोडNone
36IFFCO Chowkइफको चौक
37Millennium City Centre Gurugramमिलेनियम सिटी सेंटर गुरुग्राम

Train info

[edit]
Yellow Line
Rakes Mitsubishi Hyundai Rotem BEML Bombardier
Train Length 8
Train Gauge 1,676 mm (5 ft 6 in) broad gauge
Electrification 25 kV 50 Hz AC (nominal) from overhead catenary
Train's Maximum Speed 100 km/h
Train Operation Samaypur Badli - Millenium City Centre Gurugram

Vishwavidyalaya - Millenium City Centre Gurugram

Future extensions

[edit]

In the Phase-V of the Yellow Line of Delhi Metro will be extended to the following:

See also

[edit]

References

[edit]
  1. ↑ "Passenger Journey for Current Financial Year (2026-27) upto May'26" (PDF). backend.delhimetrorail.com. DMRC. 4 June 2026. Archived (PDF) from the original on 18 July 2026. Retrieved 18 July 2026.
  2. ↑ "Route map". delhimetrorail.com. Retrieved 23 August 2021.
  3. ↑ "PM inaugurates underground Metro". The Times of India. 19 December 2004. ISSN 0971-8257. Retrieved 10 June 2026.
  4. ↑ "Chattarpur station to open today". The Times of India. 26 August 2010. Archived from the original on 3 November 2012. Retrieved 26 August 2010.
  5. ↑ "Metro to bridge Delhi-Gurgaon divide today". The Hindu. Chennai, India. 3 September 2010. Archived from the original on 5 September 2010. Retrieved 3 September 2010.
  6. ↑ "The Jahangirpuri- Samaypur Badli section (Extension of Line-2)". Delhi Metro. Retrieved 9 November 2015.
  7. ↑ "Delhi: Udyog Bhawan Metro Station renamed to "Seva Teerth"". ANI News. 14 February 2026. Retrieved 14 February 2026.
  8. ↑ "बादली-सिरसपुर मेट्रो कॉरिडोर की डीपीआर तैयार, छह महीने से सरकार से मंजूरी का इंतजार". Navbharat Times (in Hindi). Retrieved 8 September 2024.
[edit]