Jump to content

Boon Lay MRT station

Boon Lay
EW27JS8
文礼
பூன் லே
Exterior of the station
General information
Location301 Boon Lay Way, Singapore 649846 (EWL)
100 Jurong West Street 64, Singapore 649657 (JRL)
Coordinates01°20′19″N 103°42′21″E / 1.33861°N 103.70583°E / 1.33861; 103.70583
SystemMass Rapid Transit (MRT) station
OwnerLand Transport Authority
OperatorSMRT Trains (East–West Line)
Singapore One Rail (Jurong Region Line)
Line
Platforms2 (1 island platform) + 2 (1 island platform) (U/C)
Tracks2 + 2 (U/C)
Connections Boon Lay, Taxi
Construction
Structure type
Elevated
Platform levels
1 + 1 (U/C)
ParkingYes (Jurong Point)
Cycle facilities
Yes
AccessibleYes
Other information
Station codeBNL
History
Opened6 July 1990; 36 years ago (1990-07-06) (East–West Line)
Openingmid-2028; 2 years' time (2028) (Jurong Region Line)
Former namesJurong West
Passengers
June 202441,195 per day[1]
Services
Preceding station Mass Rapid Transit Following station
Lakeside
towards Pasir Ris
East–West Line Pioneer
towards Tuas Link
Bahar Junction
towards Tawas
Jurong Region Line
Future service
Terminus
Bahar Junction Enterprise
towards Jurong Pier
Location
Boon Lay is located in Singapore Rail
Boon Lay
Boon Lay
Location within Singapore Rail

Boon Lay MRT Station is a Mass Rapid Transit (MRT) station on the East–West Line (EWL) in Jurong West, Singapore. Located along Boon Lay Way, the station is directly connected to the Boon Lay Bus Interchange and Jurong Point shopping centre, forming the Boon Lay Integrated Transport Hub. Other nearby landmarks include the SAFRA Clubhouse and Jurong West Public Library.

The station was originally announced as Jurong West, but plans for it were briefly put on hold before being reinstated in August 1987. It opened on 6 July 1990 as part of the East–West Line (EWL) and was the last station to be completed on Singapore's original MRT network. The station served as the western terminus of the EWL until the line was extended to Joo Koon station in 2009. In May 2018, it was announced that the station would become an interchange with the Jurong Region Line when the first phase of that line opens in mid-2028.

History

[edit]
EWL platforms of Boon Lay station before the installation of platform screen doors

The station, then known as Jurong West, was included in the early plans for the MRT network in May 1982 and was due to be built as part of Phase II of the initial MRT system.[2][3][4] However, in March 1986, the MRT Corporation (MRTC) announced that construction had been postponed because of delays to the Housing and Development Board's (HDB) development plans for the area.[5][6] Telecommunications cables and antenna facilities had to be relocated before Jurong West New Town could be expanded, a process expected to take six years.[7] After the HDB reached an agreement with Telecoms to vacate the site and decided to proceed with the development,[8][9] the MRTC announced on 7 August 1987 that construction of the station would go ahead.[10]

The contract to build Boon Lay station and 1.4 kilometres (0.87 miles) of viaducts was awarded in May 1988 to a joint venture between RSEA International and Hock Lian Seng Engineering for S$34.19 million (equivalent to US$44 million in 2021[11][12]).[13] On 12 August 1989, the final viaduct beam between Boon Lay and Lakeside stations was installed, marking the completion of all viaduct works for the initial MRT system.[14][15] On 10 March 1990, it was announced that the station would open on 6 July.[16] Before the station opened, the Boon Lay Bus Interchange began operations on 1 July, allowing passengers to transfer more conveniently between buses and the MRT.[17] The completion of the initial MRT system and the opening of the station were celebrated at a ceremony held at the Westin Stamford hotel in Raffles City.[18][19][20]

In 2002, new pick-up and drop-off points were built outside the station after many motorists had been stopping or parking along Jurong West Street 64.[21] In 2012, half-height platform screen doors were installed as part of the Land Transport Authority's (LTA) programme to improve safety at MRT stations.[22][23][24] Between 2012 and 2013, high-volume, low-speed fans were installed above the platforms as part of a nationwide programme to improve ventilation at station platforms.[25][26]

Boon Lay Extension

[edit]

Plans to extend the MRT to either Tuas or the Nanyang Technological University (NTU) were first announced in 1994.[27] The 3.8-kilometre (2.4-mile) Boon Lay MRT Extension (BLE) was approved in December 2004 to meet the growing demand for public transport in the Jurong Industrial Estate.[28] After the extension opened on 28 February 2009,[29][30] it was reported that it had reduced overcrowding at Boon Lay station, as some private bus operators had moved their services to Joo Koon station.[31][32]

Jurong Region Line

[edit]
Construction site of the JRL station in May 2024

On 9 May 2018, the LTA announced that Boon Lay station would become an interchange with the proposed 24-kilometre (15 mi) Jurong Region Line (JRL).[33] The station is being built as part of Stage 1 (JRL West), which includes 10 stations between Choa Chu Kang and Bahar Junction, as well as two branch lines serving Tawas and Boon Lay. This stage was originally expected to open in 2026.[34][35][36] However, construction restrictions during the COVID-19 pandemic caused delays, pushing the completion date back to 2027.[37] Further delays to construction and testing later postponed the opening to the middle of 2028.

In February 2020, the contract to design and build Boon Lay JRL station and its associated viaducts was awarded to China Communications Construction Company Limited (Singapore Branch) for S$172 million (US$126.08 million).[38][39][40]

To make way for the construction of the JRL, road diversion works along Jurong West Street 64 began in June 2022.[41][42] At the same time, a bicycle park near the station was relocated.[43] Piling works took place between August and December 2022,[44][45] and a temporary protective enclosure was installed over the East West Line (EWL) tracks.[46] The installation of viaduct segments began in February 2023.[47]

Station details

[edit]

Boon Lay MRT station serves the East West Line (EWL) and is located between Lakeside and Pioneer stations. Its station code is EW27.[48] As part of the EWL, the station is operated by SMRT Trains.[49] In the future, Boon Lay will become an interchange station with the Jurong Region Line (JRL), where it will be situated between Bahar Junction and Enterprise stations.[50] The EWL station is located along Boon Lay Way, while the JRL station is being built along Jurong West Street 64.[51]

The station is integrated with Boon Lay Bus Interchange and Jurong Point shopping centre as part of the Boon Lay Integrated Transport Hub.[52] Nearby landmarks include the Jurong West Community Building, SAFRA Clubhouse (Jurong), and Jurong West Public Library.[53]

The station also features a mural as part of SMRT's Comic Connect programme, a public art initiative showcasing heritage-themed murals created by local artists. The mural at Boon Lay station was designed by local artist Muhammed Nurman bin Selamat. It mainly depicts businessman Chew Boon Lay, after whom the area is named.[54][55] The artwork also portrays the area's rubber plantations during the early 20th century, Tuas Pek Kong Keng Temple, the headquarters of ST Engineering, and Boon Lay Shopping Centre.[55]

[edit]

References

[edit]
  1. "Land Transport DataMall". mytransport.sg. Land Transport Authority. Retrieved 14 August 2024.{{cite web}}: CS1 maint: deprecated archival service (link)
  2. "Proposed MRT Stations". The Straits Times. Singapore Press Holdings. 23 May 1982. p. 1 via NewspaperSG.
  3. "Phase 2 gets go-ahead to ensure continuity". The Straits Times. 26 October 1983. p. 8. Archived from the original on 1 June 2024. Retrieved 1 June 2024.
  4. "The South and West lines". The Straits Times. 28 October 1983. p. 9. Archived from the original on 1 June 2024. Retrieved 1 June 2024 via NewspaperSG.
  5. Dhaliwal, Rav (3 March 1986). "Uncertainty over Boon Lay station". The Straits Times. Singapore Press Holdings. p. 13. Retrieved 18 May 2024 via NewspaperSG.
  6. "Boon Lay station shelved". The Straits Times. Singapore Press Holdings. 21 March 1986. p. 14. Retrieved 18 May 2024 via NewspaperSG.
  7. "Decision on Boon Lay in 6 years". The Straits Times. Singapore Press Holdings. 30 March 1986. p. 10. Retrieved 18 May 2024 via NewspaperSG.
  8. "Boon Lay MRT station may be built after all". The Straits Times. Singapore Press Holdings. 29 July 1987. p. 15. Retrieved 18 May 2024 via NewspaperSG.
  9. "Telecoms makes way for MRT station". The Straits Times. Singapore Press Holdings. 13 August 1987. p. 18 via NewspaperSG.
  10. "Nod for Boon Lay MRT station given on Aug 7". The Straits Times. Singapore Press Holdings. 14 August 1987. p. 1. Retrieved 18 May 2024 via NewspaperSG.
  11. "M212931 - Consumer Price Index (CPI), 2019 As Base Year, Annual". Department of Statistics, Singapore. 23 May 2023. Retrieved 10 September 2023.
  12. "Official exchange rate (LCU per US$, period average)". World Bank Open Data. World Bank. Archived from the original on 25 July 2017. Retrieved 20 October 2023.
  13. "Taiwan, S'pore venture wins big MRT job". The Straits Times. Singapore Press Holdings. 10 May 1988. p. 12. Retrieved 18 May 2024 via NewspaperSG.
  14. "Last MRT viaduct beam to be laid". The Straits Times. Singapore Press Holdings. 11 August 1989. p. 18. Retrieved 18 May 2024 via NewspaperSG.
  15. "Last viaduct beams for MRT system to be laid by tomorrow". The Business Times. Singapore Press Holdings. 11 August 1989. p. 2. Retrieved 18 May 2024 via NewspaperSG.
  16. "Residents get special 'shuttle service' with Bukit MRT line". The Straits Times. Singapore Press Holdings. 11 March 1990. p. 15. Retrieved 1 June 2024 via NewspaperSG.
  17. "Boon Lay interchange to open next month". The Straits Times. Singapore Press Holdings. 9 June 1990. p. 24. Retrieved 18 May 2024 via NewspaperSG.
  18. "Speech by Dr Yeo Ning Hong, Minister (Communications & Information) and Second Minister for Defence (Policy), at the Closing Ceremony to Mark the Completion of the MRT Project and the Opening of Boon Lay Station at the Raffles Ballroom, Westin Westin Stamford on Friday, 6 July 1990 at 7.00 PM" (PDF). National Archives of Singapore. Archived (PDF) from the original on 18 May 2024. Retrieved 18 May 2024.
  19. Dhaliwal, Rav (7 July 1990). "Spores largest project built on time and below budget: Dr Yeo". The Straits Times. Singapore Press Holdings. p. 3. Retrieved 18 May 2024 via NewspaperSG.
  20. "MRT completion celebrations". The Business Times. Singapore Press Holdings. 7 June 1990. p. 2. Retrieved 18 May 2024 via NewspaperSG.
  21. Han, Liang Yuan (6 September 2002). "New drop-off, pick-up bays along Boon Lay Way". Today. p. 8. Retrieved 20 May 2024 via NewspaperSG.
  22. "Platform screen doors for all above-ground MRT stations by 2012". The Straits Times. 25 January 2008. Archived from the original on 28 January 2008.
  23. "Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25 January 2008. Archived from the original on 12 January 2015. Retrieved 11 January 2015.
  24. "LTA completes installing elevated MRT station screen doors early". Channel NewsAsia. Mediacorp. Archived from the original on 24 September 2017. Retrieved 23 September 2017.
  25. "Enhancing Connectivity and Comfort for Commuters". Land Transport Authority. 13 October 2011. Retrieved 6 July 2012.{{cite news}}: CS1 maint: deprecated archival service (link)
  26. "Connect – April 2012" (PDF). Land Transport Authority. Archived from the original (PDF) on 5 February 2018. Retrieved 8 December 2020.
  27. Leong, Chan Teik (2 November 1994). "Studies on more extensive train network soon". The Straits Times. Singapore Press Holdings. Archived from the original on 5 December 2021. Retrieved 20 May 2024.
  28. "Expanding The Rail Network: LTA To Build Boon Lay MRT Extension". Land Transport Authority. 29 December 2004. Archived from the original on 28 July 2007. Retrieved 20 May 2024.
  29. Aisha, Noor (31 October 2008). "Boon Lay MRT extension to open on Feb28" (PDF). The Business Times. Singapore Press Holdings. Archived from the original (PDF) on 20 May 2024. Retrieved 20 May 2024.
  30. "BLE Pioneer and Joo Koon Stations to Commence Operation Tomorrow". Land Transport Authority. 27 February 2009. Retrieved 20 May 2024 via Web Archive Singapore.{{cite web}}: CS1 maint: deprecated archival service (link)
  31. Yeo, Chim Gay; Goh, Yi Han (28 February 2009). "Boon for Boon Lay" (PDF). The Straits Times. Singapore Press Holdings. Archived from the original (PDF) on 20 May 2024. Retrieved 20 May 2024.
  32. Goh, Yi Jan (17 March 2009). "New stations ease peak hour crush at Boon Lay" (PDF). The Straits Times. Singapore Press Holdings. Archived from the original (PDF) on 20 May 2024. Retrieved 20 May 2024.
  33. Lim, Adrian (9 May 2018). "New Jurong Region Line to boost access for NTU students". The Straits Times. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
  34. "News Room – News Releases – Joint News Release by the Land Transport Authority (LTA) & SLA – Jurong Region Line: Enhancing Connectivity in the West". Land Transport Authority. 9 April 2021. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
  35. "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate". Channel NewsAsia. Mediacorp. 9 May 2018. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  36. Lim, Adrian (9 May 2018). "Jurong Region Line, Singapore's 7th MRT line, to open in three phases from 2026". The Straits Times. Archived from the original on 27 May 2018. Retrieved 29 July 2022.
  37. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". Ministry of Transport. 1 February 2021. Archived from the original on 9 April 2021. Retrieved 24 March 2021.
  38. "LTA Awards Three Civil Contracts to Construct Four Stations for the Jurong Region Line". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  39. "LTA awards 3 contracts worth S$596m for future Jurong Region Line". The Business Times. 13 February 2020. Archived from the original on 20 May 2024. Retrieved 20 May 2024.
  40. Yi, Wong Kai (13 February 2020). "3 civil contracts worth $596m awarded to design, construct future Jurong Region Line stations". The Straits Times. Archived from the original on 13 February 2020. Retrieved 20 May 2024.
  41. "Contract J106: Jurong Region Line (JRL) JS8 Boon Lay Station – Forecast of Construction Activities along Jurong West Street 64 for 2H 2022". Land Transport Authority. Archived from the original on 20 May 2024. Retrieved 20 May 2024.
  42. "Annex A: J106 Forecast of Works for 2H2022". Land Transport Authority. 30 June 2022. Archived from the original on 20 May 2024. Retrieved 20 May 2024.
  43. "Jurong Region Line (JRL) – JS8 Boon Lay Station (Bicycle Park Relocation)". Land Transport Authority. Archived from the original on 20 May 2024. Retrieved 20 May 2024.
  44. "Jurong Region Line (JRL) – JS8 Boon Lay Station (Piling and Casting Works)". Land Transport Authority. Archived from the original on 20 May 2024. Retrieved 20 May 2024.
  45. "Jurong Region Line (JRL) – JS8 Boon Lay Station (Extended – Piling and Casting Works)". Land Transport Authority. Archived from the original on 20 May 2024. Retrieved 20 May 2024.
  46. "Contract J106: Jurong Region Line (JRL) JS8 Boon Lay Station – Installation of Temporary Protection Enclosure (TPE) at Existing EW27 Boon Lay Station". Land Transport Authority. Archived from the original on 20 May 2024. Retrieved 20 May 2024.
  47. "Contract J106: Jurong Region Line (JRL) JS8 Boon Lay Station – Delivery of Hangar Beam and Viaduct Segments". Land Transport Authority. Archived from the original on 20 May 2024. Retrieved 20 May 2024.
  48. "MRT System Map" (PDF). Land Transport Authority. Archived (PDF) from the original on 21 August 2020.
  49. "Getting Around – Public Transport – Rail Network". Land Transport Authority. Archived from the original on 1 November 2019. Retrieved 27 April 2021.
  50. "Future System Map" (PDF). Land Transport Authority. Archived from the original (PDF) on 9 September 2020. Retrieved 9 September 2020.
  51. "JS8 Boon Lay". Land Transport Authority. Archived from the original on 26 November 2023. Retrieved 20 May 2024.
  52. "Boon for Boon Lay with LTA's New Integrated PT Hub". Land Transport Authority. 13 August 2009. Retrieved 19 June 2013.{{cite web}}: CS1 maint: deprecated archival service (link)
  53. "Boon Lay – Exits". SMRT Journeys. SMRT Corporation. Retrieved 8 December 2020.{{cite web}}: CS1 maint: deprecated archival service (link)
  54. "Commuters & Communities". SMRT. Retrieved 22 September 2024.
  55. 1 2 "Boon Lay Station" (PDF). SMRT. Retrieved 22 September 2024.
[edit]
  • Wikimedia Commons logo Media related to Boon Lay MRT Station at Wikimedia Commons
  • LTA – New Releases – Expanding The Rail Network: LTA To Build Boon Lay MRT Extension