Jump to content

Behala Chowrasta metro station

From Wikipedia, the free encyclopedia

Behala Chowrasta
Behala Chowrasta metro station gate C
General information
LocationDiamond Harbour Rd, Behala Chowrasta
Kolkata, West Bengal 700008
India
Coordinates22°29′15″N 88°18′48″E / 22.48752°N 88.31342°E / 22.48752; 88.31342
SystemKolkata Metro
OperatorMetro Railway, Kolkata
Line Purple Line 
Platforms2 (2 side platforms)
Tracks2
Construction
Structure type
Elevated
ParkingNo
AccessibleYes Disabled access
Other information
StatusOperational
Station codeKBCR
History
Opening30 December 2022; 3 years ago (2022-12-30)
Services
Preceding station The logo of the Kolkata Metro. Kolkata Metro Following station
Behala Bazar
towards Majerhat
Purple Line Sakher Bazar
towards Joka
Location
Map

Behala Chowrasta is an elevated metro station on the North-South corridor of the Purple Line of Kolkata Metro in Kolkata, West Bengal, India. It is located exactly above the Behala Chowrasta intersection on Diamond Harbour Road / NH-12. [1] It was opened in the first phase of this line. The station was commissioned on 30 December 2022.[2]

History

[edit]

Purple Line was approved in the railway budget for the financial year 2010-2011 and Rs 2,6519 crore was allocated for the construction work. In October 2011, NVRL won the tender for the construction of the Metro Corridor from Joka Metro Station to Esplanade Metro Station along with the Thakurpukur metro station.[3]

Trial runs on the 6.5-km Joka-Taratala stretch of Kolkata Metro's Purple Line began in mid-September 2022, and it received mandatory Commissioner of Railway Safety (CRS) clearance in November.[4]

The Joka–Taratala stretch was inaugurated by Prime Minister Narendra Modi on 30 December 2022 in the presence of West Bengal Chief Minister Mamata Banerjee and Railway Minister Ashwini Vaishnaw. Some students from schools like St Thomas Boys School were granted the rare opportunity to be the first ones to ride in this Joka–Taratala stretch after the inauguration.[4][5]

Station layout

[edit]
L2 Side platform, Doors will open on the left Disabled access
Platform 2 Train towards Joka (Sakher Bazar) →
Platform 1 ← Train towards Majerhat (Behala Bazar)
Side platform, Doors will open on the left Disabled access
L1 Concourse Fare control, station agent, Metro QR ticket vending machines, crossover
G Street level Exit/Entrance

Electricity and signal systems

[edit]

Like the other stations and lines of the Kolkata Metro, this station will use 750 volts DC power supply by the third railway to operate the trains.

Train movement will be conducted at this station and on the railway by communication-based train control signal system. This signal system can operate a 5 second interval train.

[edit]

References

[edit]
  1. ↑ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 25 August 2019.
  2. ↑ "PM Narendra Modi inaugurates Joka-Taratala stretch of Kolkata Metro; See Pics". zeenews.india.com. 30 December 2022. Retrieved 30 December 2022.
  3. ↑ Bandyopadhyay, Krishnendu (1 March 2019). "Work begins at Joka Metro depot, wall built". The Times of India. Retrieved 30 December 2022.
  4. 1 2 "Kolkata Metro: First glimpse of Joka-Taratala route in pics". www.livemint.com. 30 December 2022. Retrieved 30 December 2022.
  5. ↑ "In-pics: Inaugration of Vande Bharat Express, Joka-Taratala Metro & more news from Kolkata". www.telegraphindia.com. Retrieved 31 December 2022.