The Boring Company (TBC) is an American infrastructure, tunnel construction service, and equipment company founded by Elon Musk. TBC was founded as a subsidiary of SpaceX in 2017, and was spun off as a separate corporation in 2018. The original Las Vegas Convention Center Loop (1.7 miles, three stations) opened in 2021. By late 2026 the Vegas Loop had expanded to roughly 14 operational stations (including Resorts World, Encore, Westgate, Fontainebleau, and Sahara) and had carried more than 4 million passengers. Clark County has approved up to 68 miles and more than 100 stations. A roughly two-mile Paradise Road twin-tunnel section was expected to open before the November 2026 Formula 1 race.[4] The company has tested self-driving operation with a safety driver present. In September 2026 TBC raised a $3 billion Series D that valued the company at $23 billion.[5]

Many other TBC projects in cities across the United States were announced, but subsequently became inactive or were canceled.[6][7]

History

[edit]
Elon Musk discusses the Boring Company at TED 2017.

Musk first announced the idea of the Boring Company in December 2016.[8] It was registered as "TBC – The Boring Company" on January 11, 2017.[9] Musk cited Los Angeles traffic and the limits of a two-dimensional road network as his inspiration for the project.[10][11] The Boring Company was originally formed as a SpaceX subsidiary,[12] but it was spun out into a separate corporate entity the following year.[13] According to Musk, the company's goal is to increase tunneling speed and reduce its cost to the point that building a tunnel network under Los Angeles becomes financially feasible.[14][15]

Elon Musk speaking at the inauguration of the test tunnel in Hawthorne, California, December 2018

After initial funding of US$113 million, mostly from Musk and supplemented by 2018 merchandise sales,[16] the Boring Company sold $120 million in stock to venture capital firms in July 2019.[17]

In early 2018, the company completed several tests in Hawthorne, California and showcased a test tunnel on December 18, 2018.[18] It had initially intended to also build a test tunnel in Los Angeles, but canceled it at the end of the year in favor of a commercial tunnel to Dodger Stadium.[19] However, in June of that year it won its first construction bid, a tunnel to connect downtown Chicago with O'Hare International Airport,[20] although the project quickly died when Chicago's then-mayor, Rahm Emanuel, who had strongly advocated for it, chose not to seek reelection.[21]

In May 2019, it won its first construction contract, a $48.6 bid to build a tunnel and provide transportation under the Las Vegas Convention Center. Despite earlier claims of intending to develop hyperloops, the company announced the transportation network would be run with electric cars. Musk defended his scaled-back ambitions, saying the rudimentary approach was "simple and just works."[22] The tunnel, 1.7 miles (2.7 km) long, was finished in 2021; the company began offering rides to customers in October of that year.[23]

By November 2019, Steve Davis, one of Musk's early hires at SpaceX, had become company president.[24][25] In November 2020, TBC announced hiring for positions in Austin, Texas, and by December 2020 had leased two buildings near Texas Gigafactory outside of Austin.[26]

In 2021, TBC removed its planned Dodger Stadium tunnel from its website, as well as another planned tunnel between Baltimore and Washington, D.C. Both projects had been caught up in environmental review for several years.[21]

In April 2022, the company announced an additional $675 million Series C funding round, valuing the company at approximately $5.675 billion.[6] In September 2026 it raised a $3 billion Series D led by the United Arab Emirates and affiliated entities, valuing the company at $23 billion.[5] The earlier Series C round was led by Vy Capital and Sequoia Capital, with participation from Valor Equity Partners, Founders Fund, 8VC, Craft Ventures, and DFJ Growth. In 2022, the company was cited by the Texas Commission on Environmental Quality for five violations of Texas environmental regulations.[27]

By April 2023, the company had moved its headquarters and engineering facilities to Bastrop, Texas,[1] approximately 25 miles (40 km) east of Texas Gigafactory.

SpaceX president Gwynne Shotwell has said that TBC's tunneling technology could be used to build homes on Mars, and Musk has suggested it could be used to develop future Mars settlements.[28][29]

Promotion

[edit]

In 2018, the company raised several tens of millions of dollars by selling merchandise, including 50,000 baseball caps,[30] 20,000 blowtorches marketed as "flamethrowers,"[31][32] and fire extinguishers.[33]

In 2021, TBC held a student tunnel-boring competition in Las Vegas.[34] Officially named the Not-a-Boring Competition, the challenge was to "quickly and accurately drill a tunnel that was 30 m-long (98 ft) and 30 cm-wide (0.98 ft)".[34] 12 finalist teams competed; the winner was TUM Boring from Technical University of Munich.[34] A second competition was held in April 2023, this time in Texas with 5 finalists. TUM Boring again won, achieving a maximum velocity of 7 mm/s (0.28 in/s).[1]

Machines

[edit]
The boring machine in June 2019

Godot

[edit]

TBC's first boring machine was Godot, a conventional tunnel boring machine (TBM) made by the Canadian company Lovat, which it leased from Super Excavators of Wisconsin.[35]

Prufrock

[edit]

After Godot and a second second-hand machine, Linestorm, the company built its own machine, Prufrock.[36] Prufrock is designed to mine continuously, installing the tunnel liner while it digs, and is remotely controlled from the company's operations center in Bastrop, Texas.[37] The company says the machines get frequent on-site upgrades, usually designed, made and installed within 48 hours.[38] In 2022 the company said Prufrock could dig up to a mile of tunnel per week.[39]

Prufrock MB1

[edit]

Prufrock-MB ("Main Beam") is the hard-rock version of Prufrock, meant for rock strong enough to act as the tunnel lining itself. Prufrock-MB1 began tunnelling the limestone under Nashville for the Music City Loop in 2026.[37][38]

Prufrock MB2

[edit]

Prufrock-MB2 is the second hard-rock Prufrock used on the Music City Loop. It arrived in Nashville in late April 2026, and as of June 2026 it was being commissioned ahead of a planned June launch.[38]

Prufrock MB3

[edit]

In 2022 the company said its next-generation Prufrock would be able to dig up to seven miles per day.[39] As of June 2026, Prufrock-MB3 was being built.[38]

Liner Truck 3

[edit]

Liner Truck 3, introduced in August 2026, is a fully electric, remotely piloted vehicle that carries concrete liner segments to the boring machine. It uses Tesla Model 3 battery and drive units, carries more than 22,000 pounds (10.0 t) of segments, and has a range of 28 miles (45 km) and a top operating speed of 12 miles per hour (19 km/h).[40]

Process

[edit]

Porpoising

[edit]

"Porpoising" is meant to avoid digging large launch and retrieval pits. Prufrock arrives on a truck, tilts down and launches into the ground within 24 hours; at the end of the tunnel it comes back up to the surface and mines onto a trailer.[37]

Tunnel lining

[edit]

TBC introduced custom hexagonal tunnel-lining segments in its Porpoise Test 5 tunnel in Bastrop, Texas.[41] TBC says Prufrock builds each tunnel ring fully autonomously: six concrete segments of about 3,750 lb each are lifted, translated and placed into final position in under a minute, monitored remotely from the company's Global OCC in Texas.[42] Segments are carried to the machine by a fully electric, remotely piloted liner truck; the latest version, Liner Truck 3, uses Tesla Model 3 battery and drive units.[43]

Continuous tunneling

[edit]

Most soft-soil tunnel boring machines mine about five feet, stop, erect the precast concrete tunnel liner, and then start over. TBC says Prufrock is designed to install the liner while it mines, so the machine does not have to stop every five feet.[37] In August 2024, NextBigFuture reported that Prufrock 3 and Prufrock 4 could tunnel only about 11 hours per day, citing maintenance and the stops to place concrete segments as limits.[44]

Muck removal

[edit]

TBC uses a continuous conveyor, the Vertical Cassette (VC), to transport excavated material ("muck") from the tunnel boring machine to the surface.[45]

TBC says its latest version, VC7, introduced in August 2026, has a maximum muck conveyance rate of 990 tons/hour (with a 50% loaded belt) and supports a maximum TBM advance rate of 4 miles/week. The belt speed is 660 ft/minute and the minimum radius of curvature is 500 ft. TBC says "Belt Boosters" every 1.5 miles allow unlimited tunnel length.[45]

Active projects

[edit]

Hawthorne test tunnel

[edit]
Tunnel built in Hawthorne, December 2018

The Hawthorne test tunnel, or Boring test tunnel, is a 1.14 miles (1.83 km) tunnel in Hawthorne, California, intended for testing “tunneling and public transportation systems”,[46] constructed between 2016 and 2018.[47][48] It was accompanied by a mile-long aboveground tube on nearby Jack Northrop Ave designed for testing hyperloop and loop-based transportation, which was used for student competitions in 2018 and 2019 before being dismantled in 2022.[49][50]

Vegas Loop

[edit]

The Vegas Loop, originally known as the Las Vegas Convention Center Loop (LVCC Loop), is a car tunnel system that serves the Las Vegas Convention Center, area hotels and attractions, and Harry Reid International Airport. Operating since 2021, the system uses Tesla Model Y vehicles to shuttle passengers among nine stations. The Boring Company began construction in November 2019[51] and has continued intermittent tunnel drilling for planned stations.[52] When completed, the company projects that the Loop will include 68 miles of tunnels and 123 stations.[53]

By late 2026 the Vegas Loop had expanded to roughly 14 operational stations, including the original Las Vegas Convention Center stations and stops at Resorts World, Encore, Westgate, Fontainebleau, and Sahara. The system had carried more than 4 million passengers. Clark County has approved up to 68 miles of tunnel and more than 100 stations.[54]

A roughly two-mile twin-tunnel extension under Paradise Road (University Center Loop), running between the Westgate and a site near UNLV at 4744 Paradise Road, was expected to open before the November 19–21, 2026 Formula 1 Las Vegas Grand Prix. The extension was planned to add stations at 4744 Paradise, Virgin Hotels Las Vegas, and a former Gordon Biersch site. Las Vegas Convention and Visitors Authority CEO Steve Hill stated in October 2026 that both tunnels were expected to open simultaneously ahead of the race.[54][55] The company has tested self-driving operation in the tunnels with a safety driver present. Rides are provided by Tesla vehicles.[54]

Dubai Loop

[edit]

In 2026 the company signed a construction contract with Dubai’s Roads and Transport Authority for a pilot phase of 6.4 km of tunnel and four stations. Construction is planned to begin in late 2026. The September 2026 Series D is tied to a broader UAE partnership that includes plans for more than 150 km of tunnels.

Music City Loop

[edit]

The Music City Loop is an under construction underground transit tunnel system in Nashville, Tennessee, United States, that would connect downtown Nashville to the Nashville International Airport (airport code: BNA). The Boring Company initially planned to complete the project in 2026 at the earliest.[56][57][58]

A privately funded system intended to connect downtown Nashville (including Music City Center and Lower Broadway) with West End Avenue and Nashville International Airport. Tunneling began in early 2026 after state permits. As of early October 2026, Prufrock-MB1 and MB2 were mining simultaneously; MB3 was preparing for a late-October launch[when?] and MB4 was under construction. More than 40 stations were in planning or design. Local officials and environmental groups have raised concerns about karst limestone risks and transparency.[clarification needed] The company has identified a launch shaft site at 500 Lafayette Street and has received approvals related to airport and convention-center stations.[59][60][better source needed]

Universal Orlando

[edit]

In 2025, the Shingle Creek Transit and Utility Community Development District began exploring proposals for a transportation system linking the Epic Universe theme park with other Universal Orlando properties along International Drive and near Interstate 4.[61] In February 2026, the district voted to begin contract negotiations with The Boring Company regarding a proposed underground transit system modeled after the Vegas Loop.[62][63][64]

Inactive and cancelled projects

[edit]

United States

[edit]

Washington, DC to Baltimore, Maryland

[edit]

In 2017, Musk announced plans to build a Hyperloop connecting Washington, DC to Baltimore.[65] This was supplanted in 2018 by a proposal to build a route following the Baltimore–Washington Parkway.[66] The Maryland Transportation Authority officially approved the project.[67] In 2019, a draft Environmental Assessment for the project was completed.[68] As of 2021, the project was no longer listed on the company website, the federal government had received no indication the company wanted to move forward, TBC dropped a Maryland lobbyist it had hired for the project, and the company declined to comment on the project.[69]

Chicago, Illinois

[edit]

In 2018, the company won a bid to build a high-speed link from downtown Chicago to O'Hare Airport, to be known as the Chicago Express Loop.[70][71][72] As of 2021, the plan had been dropped.[73]

Los Angeles, California

[edit]

In 2018, TBC proposed to develop a 2.7-mile-long (4.3 km) test tunnel on a north–south alignment parallel to Interstate 405 and adjacent to Sepulveda Boulevard.[74]: 25:50  Public opposition and lawsuits led the company to abandon the idea.[75][76] Also in 2018, the company proposed to build a 3.6-mile (5.8 km) tunnel called the "Dugout Loop" from Vermont Avenue to Dodger Stadium. As of June 2021, the project had been removed from TBC's website.[73]

San Jose, California

[edit]

In 2019, a link between San Jose International Airport and Diridon station, was discussed as an alternative to an $800 million traditional rail link.[77] Plans were later dropped.[78]

San Bernardino County, California

[edit]

In February 2021, the San Bernardino County Transportation Authority (SBCTA) in California approved beginning contract negotiations with TBC to build a nearly 4-mile (6.4 km) tunnel connecting the Ontario airport with the Rancho Cucamonga Metrolink/Future Brightline West train station.[79] However, TBC did not submit a proposal after a third party was involved to study the project impacts.[80] As of 2022, the SBCTA has plans to build the tunnel system using "another company more familiar with the state's bureaucracy to do the Environmental Impact Report".[81]

Fort Lauderdale, Florida

[edit]

In July 2021, Fort Lauderdale, Florida, accepted a proposal from the Boring Company for a tunnel between downtown and the beach, to be dubbed the "Las Olas Loop".[82] In August 2021, the city was beginning final negotiations with TBC,[83] and Mayor Dean Trantalis estimated the total cost of the 5-mile (8.0 km) round-trip tunnel would be between $90 and $100 million, including stations.[84] As of December 2022, the city suspended efforts to continue the project.[85]

San Antonio, Texas

[edit]

Bexar County selected The Boring Company to build a transit link between downtown San Antonio, Texas and San Antonio International Airport in March 2022, but was then "ghosted" by the company.[86]

Miami, Florida

[edit]

In February 2021, Miami mayor Francis Suarez revealed that Musk had proposed to dig a two-mile tunnel under the Miami River for $30 million, within a six-month timescale, compared with $1 billion over four years estimated by the local transit authority. Much of the savings would be achieved by simplifying ventilation systems and allowing only electric vehicles.[87] As of November 2023, the city is waiting for the Miami Dade Transportation Planning Organization to complete an analysis of the project.[85]

Cameron County, Texas

[edit]

In August 2021, a preliminary concept discussion was held with officials of Cameron County on the potential construction of a tunnel from South Padre Island to Boca Chica Beach in South Texas. If built, the tunnel would be required to pass beneath the Brownsville Ship Channel.[88] It would allow SpaceX's facilities at Starbase to remain accessible if Highway 4, its sole access road, was closed.[89]

Australia

[edit]

Blue Mountains

[edit]

In January 2019, Musk responded to a tweet by an Australian member of parliament regarding a tunnel through the Blue Mountains to the west of Sydney, suggesting costs of $750 million for a 31-mile (50 km) tunnel, plus $50 million per station.[90] New South Wales' transportation department found that based on the cost of the Hawthorne tunnel, the estimated cost would be closer to $6 billion.[91][92]

Criticism

[edit]

Civil engineering experts and tunneling industry veterans questioned whether TBC could render tunnels faster and cheaper than competitors.[93][94] An editor's note in Tunnelling Journal dismissed Musk's Las Vegas tunnels as a "vanity project".[93] Public transit consultant Jarrett Walker wrote that the tunnels' capacity was "so low that it couldn't possibly be relevant to the volume of travel in a big city".[95]

Musk's planned tunnels were criticized for lacking such safety features as emergency exit corridors, ventilation systems, or fire suppression. In addition, the single lane tunnels left it impossible for vehicles to pass one another in the event of collision, mechanical failure, or other traffic obstruction, and instead would shut down the entire tunnel section.[96][97]

James Moore, director of transportation engineering at the University of Southern California, said that "there are cheaper ways to provide better transportation for large numbers of people", such as managing traffic with tolls.[98] Public transit consultant Jarrett Walker called TBC "wildly hyped", and criticized how the company "dazzled city governments and investors with visions of an efficient subway where you never have to get out of your car, [but turned] out to be a paved road tunnel".[95][99]

See also

[edit]

References

[edit]
  1. 1 2 3 "Technical University of Munich team secures second tunnelling win in Elon Musk's Not-a-Boring-Competition". New Civil Engineer. April 3, 2023. Retrieved June 19, 2023.
  2. ↑ Holmes, Aaron; Tabahriti, Sam (December 24, 2022). "The CEO of Elon Musk's Boring Company who reportedly slept at Twitter HQ with his wife and baby once owned a bar called 'Thomas Foolery'". Business Insider.
  3. ↑ "The Boring Company 2026 Profile". PitchBook. Retrieved October 25, 2026.
  4. ↑ Akers, Mick (October 22, 2026). "Boring Co.'s Vegas Loop Paradise tunnels racing toward opening ahead of Las Vegas Grand Prix". Las Vegas Review-Journal. Retrieved October 25, 2026.
  5. 1 2 "The Boring Company Series D Funding Round Announcement". The Boring Company. September 9, 2026. Retrieved October 25, 2026.
  6. 1 2 Mann, Ted; Bykowicz, Julie (November 28, 2022). "Elon Musk's Boring Company Ghosts Cities Across America". The Wall Street Journal. ISSN 0099-9660. Wikidata Q115488224. Retrieved November 28, 2022.
  7. ↑ "The Boring Company". The Boring Company. Retrieved August 21, 2024.
  8. ↑ Gajanan, Mahita (December 18, 2016). "Elon Musk's Next Venture to Tackle Traffic Is Totally 'Boring'". Fortune. Retrieved August 14, 2023.
  9. ↑ "TBC – THE BORING COMPANY". OpenCorporates. January 11, 2017. Retrieved August 1, 2023.
  10. ↑ Chafkin, Max (February 16, 2017). "Elon Musk Is Really Boring". Bloomberg. Archived from the original on February 16, 2017. Retrieved February 16, 2017.
  11. ↑ Peyser, Eve (January 30, 2017). "Elon Musk on Digging Big-Ass Tunnel: 'We Have No Idea What We're Doing'". Gizmodo. Archived from the original on February 19, 2017. Retrieved February 17, 2017.
  12. ↑ Agenda Item No. 9, City of Hawthorne City Council, Agenda Bill Archived February 24, 2021, at the Wayback Machine, 11 September 2018, Planning & Community Development Department, City of Hawthorne. Retrieved 13 September 2018.
  13. ↑ Copeland, Rob (December 17, 2018). "Elon Musk's New Boring Co. Faced Questions Over SpaceX Financial Ties". The Wall Street Journal. Archived from the original on December 18, 2018. Retrieved December 18, 2018. When the Boring Co. was earlier this year spun into its own firm, more than 90% of the equity went to Mr. Musk and the rest to early employees, ... The Boring Co. has since given some equity to SpaceX as compensation for the help, ... about 6% of Boring stock, "based on the value of land, time and other resources contributed since creation of the company".
  14. ↑ Thompson, Avery (February 16, 2017). "Elon Musk Is Really Making a Boring Company". Popular Mechanics. Archived from the original on April 28, 2017. Retrieved April 27, 2017.
  15. ↑ Heathman, Amelia. "Elon Musk's boring machine has already built a 'test trench' in Hawthorne, CA". Wired. UK. Archived from the original on July 18, 2017. Retrieved February 19, 2017.
  16. ↑ "Elon Musk's Boring Co. Raises $120 Million in First Outside Investment". Bloomberg.com. July 25, 2019. Retrieved July 6, 2024.
  17. ↑ Khalid, Amrita (July 25, 2019). "Elon Musk's Boring Co. raises $120 million in outside funding". Engadget. Archived from the original on July 26, 2019. Retrieved July 26, 2019.
  18. ↑ Lekach, Sasha (December 7, 2018). "In true Musk fashion, Boring Company test tunnel opening pushed back a week". Mashable. Archived from the original on December 14, 2018. Retrieved December 11, 2018.
  19. ↑ Shaban, Hamza (November 28, 2018). "The Boring Company cancels plans to open one of its Los Angeles test tunnels". The Washington Post. ISSN 0190-8286. Retrieved October 23, 2026.
  20. ↑ Garcia, Evan (June 19, 2018). "How Feasible is Boring Company's Plan for O'Hare Express Train?". WTTW News. Retrieved October 23, 2026.
  21. 1 2 McBride, Sarah (April 15, 2021). "Elon Musk's L.A. and Maryland Tunnel Projects Stall Before Digging Starts". Bloomberg.
  22. ↑ Bliss, Laura (May 29, 2019). "Elon Musk's $49 Million Las Vegas Loop Makes Perfect Sense—for Las Vegas". Bloomberg. Archived from the original on May 25, 2023.
  23. ↑ Cao, Sissi (June 10, 2021). "Elon Musk's Vegas Boring Tunnel Is a Disappointment, But Cities Are Eager to Have It". Observer. Retrieved August 24, 2023.
  24. ↑ McBride, Sarah (November 15, 2019). "Elon Musk's Boring Co. Is Run by a Former Bar Owner Who Can Quote Ayn Rand". Bloomberg News. Archived from the original on December 10, 2019. Retrieved December 10, 2019.
  25. ↑ Vance, Ashlee (2017) [2015]. Elon Musk: Tesla, SpaceX, and the Quest for a Fantastic Future (2nd ed.). New York: Ecco. ISBN 978-0-06-230125-3.
  26. ↑ Hardison, Kathryn (December 15, 2020). "Elon Musk's The Boring Co. grabs industrial space in Pflugerville, documents show". Austin Business Journal. Archived from the original on January 7, 2021. Retrieved December 25, 2020.
  27. ↑ Girtman, Taylor (April 5, 2023). "Boring Company cited for 3 more TCEQ violations at Bastrop facility". KXAN Austin. Retrieved March 27, 2024.
  28. ↑ "SpaceX exec says Elon Musk's Boring Company could create homes on Mars". CNET. Retrieved June 6, 2026.
  29. ↑ Strange, Adario (July 19, 2017). "Elon Musk reveals what his tunnel under LA has to do with Mars". Mashable. Retrieved June 6, 2026.
  30. ↑ Gibbs, Samuel (February 1, 2018). "Elon Musk sells all 20,000 Boring Company 'flamethrowers'". The Guardian. Retrieved March 11, 2024.
  31. ↑ Horowitz, Julia (January 28, 2018). "Elon Musk's Boring Company is now raising money by selling flamethrowers". CNN Money. Archived from the original on January 28, 2018. Retrieved August 7, 2023.
  32. ↑ "Timeout everyone. Y'all know that Musk's $500 'flamethrower' is literally a Boring blowtorch?". Situation Publishing. Archived from the original on January 30, 2018. Retrieved January 30, 2018.
  33. ↑ Browne, Ryan (February 1, 2018). "Elon Musk's Boring Company sells all of its flamethrowers in less than a week". CNBC. Retrieved October 25, 2026.
  34. 1 2 3 Paleja, Ameya (September 23, 2021). "Musk's Boring Company Announces Not-a-Boring Competition Winner". Interesting Engineering. Retrieved September 26, 2021.
  35. ↑ Loveday, Steven (August 13, 2017). "Yet Another Boring Backstory". Inside EVs. Retrieved August 7, 2023.
  36. ↑ Marshall, Aarian (June 14, 2018). "Elon Musk's Boring Company Wins a Big Boring Contract in Chicago". Wired. Retrieved August 7, 2023.
  37. 1 2 3 4 "Prufrock". The Boring Company. Retrieved June 17, 2026.
  38. 1 2 3 4 "Music City Loop - Blog 6/1". The Boring Company. Retrieved June 17, 2026.
  39. 1 2 Dent, Steve (April 21, 2022). "Elon Musk's Boring Company plans to 'significantly' expand after funding round". Engadget. Retrieved April 6, 2023.
  40. ↑ "Introducing Liner Truck 3 — our latest fully electric tunnel vehicle". X. The Boring Company. August 7, 2026. Retrieved August 8, 2026.
  41. ↑ "R&D Tunnels". The Boring Company. Retrieved October 29, 2026.
  42. ↑ "Prufrock builds tunnel rings fully autonomously". X. The Boring Company. August 8, 2026. Retrieved August 8, 2026.
  43. ↑ "Introducing Liner Truck 3 — our latest fully electric tunnel vehicle". X. The Boring Company. August 7, 2026. Retrieved August 8, 2026.
  44. ↑ Wang, Brian (August 15, 2024). "Boring Company Path to Continuous Tunneling | NextBigFuture.com". Retrieved August 19, 2024.
  45. 1 2 "Introducing Vertical Cassette 7 (VC7)". X. The Boring Company. August 7, 2026. Retrieved August 8, 2026.
  46. ↑ "Test Tunnel". The Boring Company. November 12, 2020. Archived from the original on November 12, 2020. Retrieved June 2, 2026.
  47. ↑ Artsy, Avishay (December 8, 2022). "Elon Musk's tunnels to nowhere". Vox. Retrieved August 7, 2025. In late 2016 … bought a machine and started boring a tunnel
  48. ↑ McFarland, Matt (December 19, 2018). "Elon Musk's first tunnel is finished. Here's what it's like to ride in it". CNN Business. Retrieved August 7, 2025. In 2016, a frustrated Musk said he planned to start digging tunnels … Now the joke has turned into something very real.
  49. ↑ Hawkins, Andrew J. (November 3, 2022). "Elon Musk's first Hyperloop tunnel in California is gone". Archived from the original on January 19, 2025. Retrieved June 2, 2026.
  50. ↑ Hart, Jordan. "Elon Musk's futuristic Hyperloop prototype tube has been removed from its place near SpaceX's California headquarters". Business Insider. Retrieved May 21, 2026.
  51. ↑ Romero, Dennis (November 16, 2019). "In Las Vegas, Elon Musk's tunneling company digs in". NBC News. Archived from the original on February 13, 2024. Retrieved November 16, 2019.
  52. ↑ "Las Vegas Loop tunnel reaches Virgin Hotel near UNLV, company announces on X". 8 News Now. Nexstar Media. Archived from the original on May 31, 2024. Retrieved June 4, 2024.
  53. ↑ Akers, Mick (August 26, 2026). "Boring Co.: 19 more Vegas Loop stations gain approval". Las Vegas Review-Journal. Retrieved September 22, 2026.
  54. 1 2 3 "Boring Co.'s Vegas Loop Paradise tunnels racing toward opening ahead of Las Vegas Grand Prix". Las Vegas Review-Journal. October 22, 2026. Retrieved October 28, 2026.
  55. ↑ "Will the new Vegas Loop stop near UNLV open ahead of F1?". FOX5 Las Vegas. October 20, 2026. Retrieved October 28, 2026.
  56. ↑ Hitson, Hadley; Dyos, Stuart (July 28, 2025). "Tennessee plans tunnel to Nashville airport with Elon Musk's Boring Company". The Tennessean. Nashville. Retrieved July 29, 2025.
  57. ↑ Baird, Brittney (July 28, 2025). "Elon Musk to install 'Music City Loop' tunnel from BNA to downtown Nashville". WKRN. Nashville. Retrieved July 29, 2025.
  58. ↑ "Gov. Lee, The Boring Company Unveil Transformative Underground Music City Loop Project" (Press release). Nashville: Office of the Governor of Tennessee. July 28, 2025. Retrieved July 29, 2025.
  59. ↑ "New Boring Company launch shaft plans at 500 Lafayette Street Nashville". LOOP Nashville. October 20, 2026. Retrieved October 28, 2026.
  60. ↑ "Elon Musk's Boring Company lands a new Middle East deal, and Nashville is about to get faster". Teslarati. October 8, 2026. Retrieved October 28, 2026.
  61. ↑ Butler, Shannon; WFTV.com (November 13, 2025). "Elon Musk may bring underground transit between Universal parks". WFTV. Retrieved May 12, 2026.
  62. ↑ "Elon Musk's tunneling company tapped to link Universal parks". Orlando Sentinel. February 12, 2026. Retrieved September 21, 2026.
  63. ↑ Cook, Alex (February 11, 2026). "Musk-owned 'Boring Company' tapped to tunnel from Universal Studios to Epic Universe". WKMG. Retrieved May 12, 2026.
  64. ↑ "Universal district confirmed in talks with Elon Musk's Boring Co. on transit project". Orlando Business Journal. February 11, 2026. Retrieved September 21, 2026.
  65. ↑ Wong, Julia Carrie; Levin, Sam (July 20, 2017). "Elon Musk: I got 'government approval' for New York-DC Hyperloop. Officials: no he didn't". The Guardian. Archived from the original on April 18, 2019. Retrieved April 18, 2019.
  66. ↑ LeBeau, Phil (April 18, 2019). "Musk's Boring Company pushes aggressive Baltimore-to-D.C. tunnel plan despite skeptics". CNBC. Retrieved May 29, 2023.
  67. ↑ Muoio, Danielle. "Maryland's Governor said to 'get ready' for Elon Musk's Hyperloop that will connect Baltimore and Washington D.C." Business Insider. Retrieved April 14, 2023.
  68. ↑ Snyder, Tanya (April 17, 2019). "Elon Musk's D.C.-to-Baltimore 'loop' leaps an early milestone". Politico. Retrieved September 5, 2023.
  69. ↑ Duncan, Ian. "Elon Musk's Boring Company removes D.C.-Baltimore tunnel from list of projects on website". The Washington Post. ISSN 0190-8286. Archived from the original on August 23, 2021. Retrieved April 18, 2021.
  70. ↑ "O'Hare Express competition down to two – and Elon Musk is one of them". Chicago Sun-Times. Archived from the original on March 25, 2018. Retrieved March 24, 2018.
  71. ↑ "Elon Musk's Boring Co. Wins Chicago Airport High-Speed Train Bid". Bloomberg News. June 14, 2018. Archived from the original on June 14, 2018. Retrieved June 14, 2018.
  72. ↑ Geuss, Megan (June 14, 2018). "Chicago selects Elon Musk's Boring Company to build express line from O'Hare". Ars Technica. Archived from the original on June 14, 2018. Retrieved June 14, 2018.
  73. 1 2 Farivar, Cyrus (June 8, 2021). "Fort Lauderdale officials say Elon Musk's new tunnel to the beach can't come fast enough". NBC News. Archived from the original on July 3, 2021. Retrieved July 3, 2021.
  74. ↑ Elon Musk, Steve Davis. The Boring Company Information Session (video). Leo Baeck Temple, Los Angeles, California: The Boring Company. Archived from the original on May 20, 2018. Retrieved May 20, 2018 – via YouTube.
  75. ↑ "Elon Musk's Boring Co. drops LA Westside tunnel plan". TechCrunch. November 28, 2018. Archived from the original on November 28, 2018. Retrieved November 28, 2018.
  76. ↑ Ho, Vivian (November 29, 2018). "Elon Musk scraps plans for Los Angeles tunnel after lawsuit settlement". The Guardian. ISSN 0261-3077. Retrieved March 24, 2023.
  77. ↑ Deruy, Emily (February 5, 2019). "San Jose: Mayor in talks with Elon Musk's Boring Company for airport tunnel". The Mercury News. Archived from the original on February 6, 2019. Retrieved February 6, 2019.
  78. ↑ Kay, Grace. "Elon Musk's The Boring Company was launched after traffic was driving the founder 'nuts'". Business Insider. Retrieved March 15, 2024.
  79. ↑ "Ontario airport tunnel project by Elon Musk moves to next phase". Daily Bulletin. February 5, 2021. Archived from the original on April 16, 2021. Retrieved July 16, 2021.
  80. ↑ "Elon Musk might not build tunnel to Ontario Airport after all". Daily Bulletin. July 19, 2022. Retrieved December 15, 2023.
  81. ↑ "San Bernardino County moving ahead with tunnel project, with or without Elon Musk technology". ABC7 Los Angeles. July 29, 2022. Retrieved December 15, 2023.
  82. ↑ McFarland, Matt (July 7, 2021). "Fort Lauderdale accepts proposal for Elon Musk's Tesla beach tunnel". CNN. Archived from the original on July 9, 2021. Retrieved July 9, 2021.
  83. ↑ "Elon Musk's Boring Co. Nears Deal to Build Tunnel in Florida". Bloomberg.com. August 31, 2021. Retrieved November 1, 2021.
  84. ↑ "Fort Lauderdale's Mayor On The Tesla Tunnel That Could Be Coming To The City". WLRN. August 23, 2021. Retrieved November 1, 2021.
  85. 1 2 Portero, Ashley (November 2, 2023). "What happened to the Boring Company tunnels pitched for South Florida?". South Florida Business Journal. Retrieved July 9, 2024.
  86. ↑ Biediger, Shari (January 30, 2025). "Elon Musk's Boring Company 'ghosted' San Antonio on transit tunnel plan".
  87. ↑ Wile, Rob; Flechas, Joey (February 5, 2021). "Elon Musk tells Suarez he's interested in a tunnel for electric vehicles under Brickell Ave. Bridge". Miami Herald. Archived from the original on February 11, 2021. Retrieved February 9, 2021.
  88. ↑ Clark, Steve (August 22, 2021). "SPI-to-Boca Chica tunnel? Musk's Boring Company floats idea". RGV News. Retrieved August 24, 2021.
  89. ↑ Davila, Gaige (August 29, 2021). "Tunnel from Isla Blanca to Boca Chica proposed by Musk-owned company". Port Isabel-South Padre Press. Retrieved August 25, 2023.
  90. ↑ Connellan, Shannon (January 18, 2019). "Elon Musk does the math on another massive tunnel". Mashable. Archived from the original on January 21, 2019. Retrieved January 21, 2019.
  91. ↑ Weir, Ben; O'Sullivan, Matt (January 17, 2019). "Public servants run the numbers over Musk's 'bargain' Blue Mountains tunnel". The Sydney Morning Herald. Retrieved February 24, 2025.
  92. ↑ "Tunnel experts dismiss Elon Musk's Blue Mountains plan as 'Alice in Wonderland stuff'". ABC News. January 17, 2019. Retrieved April 7, 2023.
  93. 1 2 Farivar, Cyrus (June 8, 2021). "Urban tunnels by Musk's Boring Co. draw industry skepticism". NBC News. Retrieved August 7, 2023.
  94. ↑ Hawkins, Andrew J. (January 23, 2018). "The Boring Company's plan to dig a longer tunnel under Los Angeles is up in the air". The Verge. Archived from the original on July 9, 2021. Retrieved July 7, 2021.
  95. 1 2 Walker, Jarrett (May 25, 2019). "Why Write About Elon Musk?". Human Transit. Archived from the original on July 9, 2021. Retrieved July 7, 2021.
  96. ↑ "Tunnelling Journal April / May 2021". The Tunnelling Journal. Archived from the original on July 9, 2021. Retrieved July 3, 2021.
  97. ↑ Walker, Alissa (January 8, 2020). "Stop calling Elon Musk's Boring tunnel public transit". Curbed. Archived from the original on July 3, 2021. Retrieved July 3, 2021.
  98. ↑ Penn, Ivan (December 19, 2018). "It's Showtime for Elon Musk's Boring Co., With a Long Way to Go". The New York Times. ISSN 0362-4331. Archived from the original on February 24, 2021. Retrieved July 7, 2021.
  99. ↑ Tangermann, Victor (November 29, 2023). "In Seven Years, Elon Musk's Boring Company Has Only Drilled 2.4 Miles of Tunnel". Futurism. Retrieved March 11, 2024.
[edit]

Many other TBC projects in cities across the United States were announced