Line 2 (Guangzhou Huangpu Tram)
| Guangzhou Huangpu Tram Line 2 | |
|---|---|
| THP2 | |
A tram in Kaiyuan Road East station | |
| Overview | |
| Native name | 广州黄埔有轨电车2号线 |
| Owner | Guangzhou Huangpu Light Rail Line 2 Construction & Investment Co., Ltd. |
| Locale | Huangpu District, Guangzhou, Guangdong |
| Termini | |
| Stations | 8 (in operation) 20 (future)[1] |
| Service | |
| Type | Tram |
| System | Guangzhou Trams |
| Services | 1 |
| Operator(s) | Guangzhou Metro Transit Development Co., Ltd. |
| Depot(s) | Yuangang Depot Liucun Depot |
| History | |
| Opened | 20 June 2025 |
| Technical | |
| Line length | 4.9 km (3.0 mi) |
| Number of tracks | 2 |
| Character | At-grade |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Guangzhou Huangpu Tram Line 2 (Chinese: 广州黄埔有轨电车2号线) is a tram line serving the Huangpu District of Guangzhou, operated by Guangzhou Trams. On 20 March 2023, the northern section of the Guangzhou Huangpu Tram Line 2 project (Xiangxue Subway Station - Kaiyuan Road East Station) was put into trial operation.[1] On 20 June 2025, the northern section officially opened for passenger service.[2] It is 14.38 km (8.9 mi) in length with 20 stations,[3] of which currently 8 stations spanning 4.9 km (3.0 mi) are operational.

The northern section of this line (Xiangxue Subway Station – Kaiyuan Road East) completed its pre-operation safety assessment as early as April 2023. However, due to disagreements between the owner and the operator regarding the entrusted operation contract, and the failure to rectify some issues identified in the safety assessment, its opening was delayed until 20 June 2025.[4][5] The remaining southern section is still under construction and will be developed in conjunction with related municipal facilities.[6]
Fares
[edit]The line uses fixed independent fare. Single journey costs 2 RMB regardless of the distance.[2]
Stations
[edit]| Station No. |
Station name | Connections | Distance km |
Location | ||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| THP201 | Xiangxue Subway Station | 地铁香雪站 | THP1 THP101 6 632 |
Huangpu | ||
| THP202 | Huangpu Library | 黄埔图书馆 | ||||
| THP203 | Xiazhong Road | 下中路 | ||||
| THP204 | Luofeng | 萝峰 | ||||
| THP205 | Xiangxue Road East | 香雪大道东 | ||||
| THP206 | Xiangxue Park | 香雪公园 | ||||
| THP207 | Yuyan Road | 玉岩路 | ||||
| THP208 | Kaiyuan Road East | 开源大道东 | ||||
| Yunpu 5th Road (U/C) | 云埔五路 | |||||
| Liucun (U/C) | 刘村 | |||||
| Yunpu 3rd Road (U/C) | 云埔三路 | |||||
| Yunpu 1st Road (U/C) | 云埔一路 | |||||
| Yuangang (U/C) | 元岗 | |||||
| Pubei Road (U/C) | 埔北路 | |||||
| Yunpu Industrial Zone (U/C) | 云埔工业区 | |||||
| Punan Road (U/C) | 埔南路 | |||||
| Yantian (U/C) | 严田 | |||||
| Kaichuang Road South (U/C) | 开创大道南 | |||||
| Nangangxu (U/C) | 南岗圩 | |||||
| Nangang Subway Station | 地铁南岗 | 13 1329 | ||||
History
[edit]Planning
[edit]In December 2017, the feasibility study for the line was approved, and preliminary design preparations were subsequently carried out.[7] On 1 July 2019, the environmental impact assessment for the route was released for public comment.[8]
Construction
[edit]The groundbreaking ceremony for this line was held on 28 September 2019,[9] and construction officially commenced on 25 December the same year.[10] Construction on the Xiangxue Road section (from Xiangxue Subway Station to Xiangxue Park Station) officially began in April 2020, with track laying commencing in early October the same year.[11] Main construction was completed in late October 2020.[12]
In March 2021, construction officially began on the Yuyan Road section. On 1 July the same year, the tracks for the Xiangxue Road section and the Yuyan Road section (from Xiangxue Subway Station to Yunfeng Road Station) were successfully connected.[13]
On 16 April 2022, the first continuous section of the Huangpu Tram viaduct across the Guangzhou-Shenzhen Expressway was successfully poured.[14]
As of 2026, the main structures of key control points of the southern section of Line 2, such as the elevated bridge across the Guangzhou-Shenzhen Expressway and the newly built bridge across the Nangang River, have been completed. However, construction on some other points is still unable to commence due to the progress of planned municipal engineering projects, with notable sections including the Yuyun Road section at Yunpu 5th Road, the track connection between Punan Road and Kaichuang Road Bridge and the Hongming Road Overpass between Yantian and Kaichuang Road South. Construction on the Nangang section (between Nangang River and Nangang Subway Station) will also have to wait until the old village renovation project in Nangang Community starts.[15]
Operation
[edit]On 28 December 2020, the day Line 1 opened to the public, in conjunction with the opening of the 13th Luogang Xiangxue Cultural Tourism Festival, the Jiaotong Investment Group announced that the section of Line 2 from Huangpu Library to Xiangxue Park would be open for trial rides from the following day until 3 January 2021, to facilitate tourists' visits to Xiangxue Park to appreciate plum blossoms.[16][17]
In early March 2023, the northern section completed its initial safety pre-operation assessment. It began trial operation without passengers on the 20th the same month.[18] On 13 April, the Guangzhou Municipal Development and Reform Commission approved the fare scheme for Line 2. On 25 April 2023, the northern section passed the pre-opening safety assessment.[19][20]
The northern section began initial operation on 20 June 2025.[21]
See also
[edit]References
[edit]- 1 2 "广州黄埔有轨电车2号线最新消息(线路图+全程站点+通车时间)" (in Simplified Chinese). 29 July 2023.
- 1 2 "黄埔区有轨电车2号线北段正式开通!)" (in Simplified Chinese). 23 June 2025.
- ↑ "黄埔有轨2号线北段开通)" (in Simplified Chinese). 20 June 2025.
- ↑ "关于广州开发区 黄埔区2023年预算执行情况与2024年预算草案的报告" [Report on the Implementation of the 2023 Budget and the Draft 2024 Budget of Guangzhou Development Zone and Huangpu District]. People's Government of Huangpu District, Guangzhou (in Simplified Chinese). 23 February 2024. Archived from the original on 29 July 2024. Retrieved 3 May 2026.
- ↑ 李天研 (Li Tianyan) (19 June 2025). "黄埔有轨2号线北段(地铁香雪站-开源大道东站)明日开通" [The northern section of Huangpu Tram Line 2 (from Xiangxue Subway Station to Kaiyuan Road East Station) will open tomorrow.]. Guangzhou Daily (in Simplified Chinese). Retrieved 3 May 2026.
- ↑ 李天研 (Li Tianyan) (1 July 2023). "黄埔有轨1号线3岁啦!工作日客流达1.2万人次/天" [Huangpu Tram Line 1 turns 3! Weekday passenger flow reaches 12,000 passengers per day.]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 16 July 2023. Retrieved 3 May 2026.
- ↑ "重磅!黄埔有轨电车2号线来啦!"嗖的"一下,就从南岗到香雪了!" [Big news! Huangpu Tram Line 2 is coming! It will take you from Nangang to Xiangxue in no time!]. Guangzhou Huangpu Release Official WeChat Account (in Simplified Chinese). 10 May 2019. Archived from the original on 4 April 2023. Retrieved 3 May 2026.
- ↑ "黄埔区有轨电车2号线(香雪~南岗)项目 环境影响报告书全本公示" [Full text of the Environmental Impact Report for the Huangpu District Tram Line 2 (Xiangxue ~ Nangang) Project is now available for public comment.]. Guangzhou Development Zone Construction and Transportation Bureau (in Simplified Chinese). Guangzhou Development Zone Transportation Investment Group. 1 July 2019. Archived from the original on 10 July 2019.
- ↑ "黄埔有轨电车2号线动工 计划2022年通车" [Construction begins on Huangpu Tram Line 2, with plans to open in 2022.] (in Simplified Chinese). New Express Daily. 30 August 2019. Archived from the original on 4 September 2019.
- ↑ "独家!现场高清大图,黄埔区有轨电车2号线将正式开工" [Exclusive! High-resolution photos from the scene: Huangpu District Tram Line 2 will officially begin construction.] (in Simplified Chinese). "Yunpu Life" Official WeChat Account. 24 December 2019. Retrieved 3 May 2026.
- ↑ "国庆不停工!黄埔有轨电车2号线香雪站至香雪公园站开始铺轨" [Construction continues during National Day! Track laying begins on Huangpu Tram Line 2 between Xiangxue Station and Xiangxue Park Station.] (in Simplified Chinese). "Luogang Xiangxue Network" Official WeChat Account. 5 October 2020. Retrieved 3 May 2026.
- ↑ 李天研 (Li Tianyan) (30 October 2020). "黄埔有轨2号线香雪大道段主体工程完工,离通车又近一步" [The main construction of the Xiangxue Avenue section of Huangpu Tram Line 2 has been completed, bringing it one step closer to opening.]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2 November 2020.
- ↑ 柳卓楠 (1 July 2021). "黄埔有轨电车2号线香雪站至云峰路站轨道贯通!" [The track for Huangpu Tram Line 2, from Xiangxue Station to Yunfeng Road Station, has been completed!]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 9 July 2021. Retrieved 3 May 2026.
- ↑ 郭军 (Guo Jun) (16 April 2022). "广州黄埔有轨电车2号线建设取得突破性进展" [Breakthrough progress has been made in the construction of Guangzhou Huangpu Tram Line 2.]. China News Network (in Simplified Chinese). Archived from the original on 1 April 2023. Retrieved 3 May 2026 – via China Youth Network.
- ↑ People's Government of Huangpu District, Guangzhou (15 November 2024). "有轨电车二号线元岗站何时通车" [When will Yuangang Station on Tram Line 2 open?]. People's Daily Online Leaders' Message Board (in Simplified Chinese). Archived from the original on 11 December 2024. Retrieved 3 May 2026.
- ↑ 李志文 (Li Zhiwen) (30 December 2020). "搭电车看梅花去!黄埔有轨电车2号线香雪大道段试运行6天" [Take the tram to see the plum blossoms! Huangpu Tram Line 2, Xiangxue Avenue section, begins 6-day trial operation.]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 1 April 2023. Retrieved 3 May 2026.
- ↑ "【预约报名】试乘体验黄埔有轨电车2号线 赏香雪梅花~" [[Reservation Required] Try out the Huangpu Tram Line 2 and enjoy the fragrant plum blossoms~]. Guangzhou Development Zone Transportation Investment Group (in Simplified Chinese). 28 December 2020. Archived from the original on 2 August 2025. Retrieved 3 May 2026 – via Official WeChat Account.
- ↑ 李志文 (Li Zhiwen) (20 March 2023). "广州黄埔有轨电车2号线北段开始试运行,为5月开通运营奠定基础" [The northern section of Guangzhou Huangpu Tram Line 2 has begun trial operation, laying the foundation for its opening in May.]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 20 March 2023. Retrieved 3 May 2026.
- ↑ "重磅!黄埔区有轨电车2号线PPP项目(北段)完成初期运营前安全评估" [Big news! The Huangpu District Tram Line 2 PPP project (North Section) has completed its pre-operation safety assessment.] (in Simplified Chinese). Guangzhou Development Zone Transportation Investment Group. 27 April 2023. Archived from the original on 13 July 2023.
- ↑ 刘珊 (11 December 2023). "黄埔有轨电车2号线北段预计年内开通运营" [The northern section of Huangpu Tram Line 2 is expected to open for operation within this year.]. Nanfang Daily (in Simplified Chinese). Archived from the original on 11 December 2023. Retrieved 3 May 2026.
- ↑ 李应华 (Li Yinghua) (20 June 2025). "免费三天 黄埔区有轨电车2号线北段今日正式开通!" [The northern section of Huangpu District Tram Line 2 officially opened today, offering free admission for three days!]. New Express Daily (in Simplified Chinese). Archived from the original on 20 June 2025. Retrieved 3 May 2026.
External links
[edit]
Media related to Huangpu Tram Line 2 at Wikimedia Commons